Auburn · Lake Martin · Lake Harding

Suction dredge excavation for boat slips, channels, and ponds

Auburn Dredging is a suction dredging service for boat slips, boathouses, channels, and ponds serving Auburn, Lake Martin, and east Alabama. Depth checked before we quote, permits filed before we pump, prices published before you call.

Restoring a silted boat slip on Lake Martin costs $2,500 to $6,000 for a typical single slip, and the job runs in three parts: an Alabama Power shoreline permit plus Corps of Engineers coverage under Nationwide Permit 19, which caps minor dredging at 25 cubic yards; a suction dredge that pumps the sediment through a sealed line to geotextile dewatering tubes on the bank; and spoil that either spreads on your property once it drains or leaves by truck at $15 to $35 a cubic yard. Pumping takes one to two days, permits take two to six weeks, and a dredged slip typically holds its depth 10 to 20 years on open water, less near a creek mouth. The same method cleans out farm ponds, stormwater basins, and marina basins without draining them.

Instant estimate

See your price range right now

Three questions, priced straight from the published cost guide. No email wall, and the range updates as you answer.

Your likely range
$3,400 to $5,100

Sediment depth moves the price inside the range. A quick sounding at the boathouse pins it down before we put anything in writing.

Want this range confirmed in writing? We check it against a sounding at your dock and call back with the exact number.

Free, no obligation, and we don’t share your information.

What we dredge

Three kinds of water, one method

Boat slips & boathouses

The pontoon that touches bottom at winter pool is the classic Lake Martin call. We sound the slip, pull the accumulated silt back out to the depth it was dug with, and clear the approach lane if the flat has crept past your boathouse mouth. The boat floats in every season again, and the fix holds for a decade or more.

Ponds & stormwater basins

Farm ponds, subdivision amenity water, and the stormwater basins every HOA owns a piece of. Suction dredging restores the original depth with the water and fish still in place, and for stormwater basins we document the recovered volume against the engineering drawings so inspections have an answer.

Channels, marinas & permits

Community channels, HOA basins, and marina slips price by measured volume, and every job on Alabama Power or Georgia Power water starts with the shoreline permit. We prepare the filings ourselves, and the permit page explains the whole process in plain words before you commit to anything.

How a job runs

From first call to full depth

  1. 1

    Depth check

    We sound the slip or survey the pond, measure the sediment, and give you a written number from the published table. The $300 to $800 fee credits against the job.

  2. 2

    Permits

    Alabama Power or Georgia Power shoreline approval plus Corps of Engineers coverage, prepared and filed by us. Two to six weeks, and nothing floats until it clears.

  3. 3

    Setup

    The dredge arrives by barge or ramp, dewatering tubes stage on the bank, and a turbidity curtain rings the work area.

  4. 4

    Pumping

    The suction head walks the bottom and sends sediment through a sealed line to the tubes. A single slip pumps in one to two days.

  5. 5

    Spoil and closeout

    Tubes drain clear water back to the lake for a few weeks, then the dried spoil spreads on site or leaves by truck. You get the depth soundings before and after.

Published pricing

The numbers, before you call

Dredging quotes in this part of Alabama have a habit of arriving only after a salesman visit. Ours start on a public page. These are the ranges we quote from, and the full cost guide explains what moves each one.

JobTypical range
Depth check and sediment survey$300 to $800
Single boat slip$2,500 to $6,000
Boathouse plus approach lane$4,000 to $9,000
Pond cleanout, under 1 acre$12,000 to $35,000
Service area

Auburn out to the water

We work from Auburn across Lake Martin’s shoreline towns, up the Tallapoosa to Tallassee’s river lakes, and east to Lake Harding and the Chattahoochee. Each area page covers the water we actually work there, what it costs, and the questions owners in that spot ask.

Straight answers

Asked before every job

What does it cost to dredge a boat slip on Lake Martin?

Most single slips run $2,500 to $6,000. Sediment depth and where the spoil can go are what move the number, and our cost guide publishes the full table so you can see the range before you ever call.

Do I need a permit to dredge my slip or shoreline?

Yes. On Lake Martin, Yates, and Thurlow, Alabama Power approves shoreline work, and the Corps of Engineers covers minor dredging under Nationwide Permit 19 up to 25 cubic yards. We prepare and file both before any work starts.

Does suction dredging muddy the lake or hurt fish?

No. The sediment travels through a sealed line to dewatering tubes on the bank, a turbidity curtain rings the work area, and the water that returns to the lake has filtered clear. Ponds get dredged with the fish still in them.

More on the FAQ page, including drawdown timing, spoil handling, and what happens when a permit gets kicked back.

Start with the depth check

Tell us where the water is and what it is doing. We’ll sound it, measure the sediment, and hand you a written quote priced off the public table. If dredging is not the right answer for your spot, we say that too.

Free written quote · Published pricing · Permits handled before work starts

We can take 3 more dredge projects this season.

Get a depth check(334) 610-0188